This site is being progressively translated. Some content may still appear in Korean.
🏭 BUCHEON TECHNOPARK · COMPLEX 3

Bucheon Techno Park
Introduction to Complex 3

success businessBucheon Techno Park Complex 3 for.
All tenants Maximizing synergy through networkingand by improving the efficiency of the support headquarters activities.
Realizing cost reduction and competitiveness improvement Good complex for doing businessis being created.

More about Bucheon Techno Park Complex 3

Completed in 2004 · Apartment-type knowledge industry center · District heating complex

2004.03
Completion
SK E&C · Korea Development Construction
42,937
site area
12,988.50 pyeong
122,081
Total floor area
Factory, unit, parking lot
950
Parking available
Basement 208, Parking lot 531, Above ground 211
115
District heating medium hot water
Supply 115℃, water return 60℃
3Gaedong
complex composition
Factory building, unit building, parking building
Aerial view of Bucheon Techno Park Complex 3 Panoramic view of Bucheon Techno Park Complex 3

Complex main specifications

Construction company
SK E&C · Korea Development
Completion date
March 29, 2004
site area
42,937.40㎡ (12,988.50 pyeong)
Total floor area
  • factory building 97,705.99㎡ (29,555.92 pyeong)
  • Budae-dong 9,308.37㎡ (2,815.76 pyeong)
  • parking lot 15,066.43㎡ (4,557.57 pyeong)
Number of parking spaces
gun 950 units (Underground parking lot 208, parking lot 531, surface parking lot 211)

Industrial infrastructure and facility systems

Stable energy supply through district heating heat exchange - supports the production environment of tenant companies

Factory building firefighting and sprinkler equipment
FIRE · Factory Building

Firefighting · Sprinkler

  1. Sprinkler — Main pump 2 units of 125HP · 1 unit of 60HP, 1 each SPARE / 1 auxiliary pump 10HP · 1 7.5HP
  2. Sprinkler — Main pump 2 units of 20HP, 1 each SPARE / 1 auxiliary pump 7.5HP
  3. Sprinkler — Main pump 60HP 2 units, 1 each SPARE / 1 auxiliary pump 7.5HP
  4. Sprinkler — 2 units of 20HP, 1 each SPARE / 1 auxiliary pump 7.5HP
  5. Outdoor parking lot — fire hydrant main pump 2 units of 100HP / 1 auxiliary pump 10HP
Water and mechanical equipment
UTILITY · Water

water equipment

  1. machine room — Water supply and drainage, hot water supply, sanitary equipment, sewage purification, district heating, fire extinguishing, gas equipment, electricity, lighting
  2. electrical room — Electricity, lighting, elevators (2 for passengers), capacity 500KW · Generator 200KW
HEATING · District heating

By using district heating (heat exchange) Medium-temperature water is supplied to each tenant using a circulation pump.This is a heating system. Medium hot water inlet temperature (SUPPLY) 115℃ · Outlet temperature (RETURN) 60℃

water separator — Expansion/absorption function, degassing function, water replenishment function. This is a system that maintains and supplies a stable, constant pressure to the tenants in each building.

AI optimized homepage + Our blog in 10 languages
Get support!

‘Spider’ project The tenants of the complex are
To AI-optimized homepage Renewal + Our blog in 10 languagesYou can receive support.

Want your technopark (knowledge industrial center) to appear in global AI search?

BTPA is the official gateway connecting your company with industries in Bucheon, Korea
for cooperation, trade, investment, and technology partnerships.
Find partners for MOU, OEM/ODM production, import/export and joint projects to expand your business.

Global Partnership Inquiry →