Bucheon Techno Park
Introduction to Complex 3
success businessBucheon Techno Park Complex 3 for.
All tenants Maximizing synergy through networkingand by improving the efficiency of the support headquarters activities.
Realizing cost reduction and competitiveness improvement Good complex for doing businessis being created.
More about Bucheon Techno Park Complex 3
Completed in 2004 · Apartment-type knowledge industry center · District heating complex
SK E&C · Korea Development Construction
12,988.50 pyeong
Factory, unit, parking lot
Basement 208, Parking lot 531, Above ground 211
Supply 115℃, water return 60℃
Factory building, unit building, parking building
Panoramic view of Bucheon Techno Park Complex 3
Complex main specifications
- Construction company
- SK E&C · Korea Development
- Completion date
- March 29, 2004
- site area
- 42,937.40㎡ (12,988.50 pyeong)
- Total floor area
-
- factory building 97,705.99㎡ (29,555.92 pyeong)
- Budae-dong 9,308.37㎡ (2,815.76 pyeong)
- parking lot 15,066.43㎡ (4,557.57 pyeong)
- Number of parking spaces
- gun 950 units (Underground parking lot 208, parking lot 531, surface parking lot 211)
Industrial infrastructure and facility systems
Stable energy supply through district heating heat exchange - supports the production environment of tenant companies

Firefighting · Sprinkler
- ①Sprinkler — Main pump 2 units of 125HP · 1 unit of 60HP, 1 each SPARE / 1 auxiliary pump 10HP · 1 7.5HP
- ②Sprinkler — Main pump 2 units of 20HP, 1 each SPARE / 1 auxiliary pump 7.5HP
- ③Sprinkler — Main pump 60HP 2 units, 1 each SPARE / 1 auxiliary pump 7.5HP
- ④Sprinkler — 2 units of 20HP, 1 each SPARE / 1 auxiliary pump 7.5HP
- ⑤Outdoor parking lot — fire hydrant main pump 2 units of 100HP / 1 auxiliary pump 10HP

water equipment
- ①machine room — Water supply and drainage, hot water supply, sanitary equipment, sewage purification, district heating, fire extinguishing, gas equipment, electricity, lighting
- ②electrical room — Electricity, lighting, elevators (2 for passengers), capacity 500KW · Generator 200KW
By using district heating (heat exchange) Medium-temperature water is supplied to each tenant using a circulation pump.This is a heating system. Medium hot water inlet temperature (SUPPLY) 115℃ · Outlet temperature (RETURN) 60℃
water separator — Expansion/absorption function, degassing function, water replenishment function. This is a system that maintains and supplies a stable, constant pressure to the tenants in each building.
AI optimized homepage + Our blog in 10 languages
Get support!
‘Spider’ project The tenants of the complex are
To AI-optimized homepage Renewal + Our blog in 10 languagesYou can receive support.